50p head wrote:Train strike on Sat 1st, Southwestern trains not running at full capacity, if at all. I assume a coach will be arranged, but that is a trek in one day. Look for a hotel and drive it is then.
Train strike on Sat 1st, Southwestern trains not running at full capacity, if at all. I assume a coach will be arranged, but that is a trek in one day. Look for a hotel and drive it is then.
Going to probably go down that route also.