From where I live its the Blackwall Tunnel for me and my sat nav sent me a way slightly different to what I would have taken. However from setting off the arrival time increased by 23 minutes due to traffic. I am sure Danson thought I was mad the way I went back to London but most of the time we were moving even in Park Lane where there were also roadworks. Anyone driving in the Central, east and South East area of London be advised roadworks are on the increase till March when they are to be banned (except emergencies) due to some running and chucking competition at Stratford.